LNG inspection packages: separate construction evidence from operating questions

Define the equipment, lifecycle stage and review responsibilities before assembling an LNG-related NDT scope.

Start with the decision you need to make

An LNG facility contains different equipment and structures with different requirements. Identify the asset and lifecycle stage before carrying a fabrication inspection plan into an operating inspection request. Construction records can establish useful history, but they do not automatically answer a current condition question. Keep the design basis, owner programme and requested examination distinct. Where cryogenic service or a specific regulatory framework is relevant, provide that context for the responsible technical review rather than assuming a generic scope is sufficient.

What to check and why it matters

Use these questions to reveal missing evidence before deciding the next step.
Decision areaEvidence to prepareQuestion to resolve
Asset boundaryIdentify the vessel, piping, tank or structural item and its material records. Do not treat the facility name as a complete technical description.Which components are included and where does this work package stop?
Lifecycle questionSeparate fabrication verification, repair support and in-service condition work. Gather records relevant to the current question.What has changed since the previous examination or original construction?
Review and handoverIdentify the owner, engineering and regulatory responsibilities that apply to the package. Agree traceable report and location references.Who determines whether the evidence supports the intended operating or maintenance decision?

Illustrative example · Not a customer case study

Apply the questions to a real-world situation

Hypothetical package: a maintenance team supplies fabrication weld reports for a piping section now requiring a condition review. The planner retains those reports as history but adds current service context, component changes and the owner’s inspection objective. The examination scope is then reviewed for the present question. The old dossier is neither discarded nor treated as proof of current condition.

Prepare your working brief

Capture what is known and name the unresolved questions. You can use the worksheet without registering or sending information to Atlantis.

Equipment boundary
Identify the asset class, materials and relevant drawings.
Lifecycle stage
State fabrication, repair or in-service purpose.
Service context
Describe the operating context needed for technical review without confidential process details.
Historical evidence
List construction reports, repairs and prior inspections available.
Approval route
Identify the owner and technical roles that accept the deliverables.
Create and download your brief →

When you need project-specific support

Request an application-specific LNG-related NDT scope review. Confirm the current deliverables and fit for your requirement with the Atlantis team.

For programme boundaries, discuss inspection programme consulting. Confirm the current deliverables and fit for your requirement with the Atlantis team.

For a US enquiry, include the project state and time zone, the responsible employer or owner, and the documents governing the work. For other countries, include the relevant recognition or customer requirements. Delivery and availability are confirmed for the engagement.

Request an inspection scope review

Scope and further reading

LNG, cryogenic or regulatory authorization is not implied. Confirm the specific capability, governing requirements and responsible approvals for the engagement.

Continue with the detailed companion guide, Separating Fabrication and In-Service Evidence in an LNG Asset Handover, for a related evidence-handling workflow and its source references. The planning suggestions here are original discussion aids, not approved procedures or reproductions of standards.

Browse every guide in this resource library →

Ready to discuss your requirement?

Prepare a short brief about lng inspection planning. The linked contact page retains the topic and selected service.